Plans are afoot to build a wind farm of 9 wind turbines just 6 miles from Threlkeld
at Berrier on the east side of Blencathra. These will be visually intrusive
from quite a few areas in Threlkeld parish. Threlkeld parish council have written
to EDC objecting to the wind farm, stressing that the Parish Council are in
favour of sustainable technology and would normally support it, but that this
is inappropriately sited and would have a detrimental effect on this parish.
Over 1000 objections now recorded against Berrier wind farm and GROWING.
Lots of people still do not know about the wind company plans however, so
the local, national and world-wide campaign must continue.
- It will diminish an iconic view to and from Blencathra; one of the most
famous mountains in Lakeland
- In turn these will blunt the appeal of Sharp Edge; it is one of the
finest ridge scrambles in the Lake District.
- It will introduce a discordant and non-harmonious element into the Northern
Fells
- It will upset the visual unity of the Lake District National Park as
the proposed wind farm is adjacent to the north eastern boundary.
- This is a sensitive environment which will not be able to absorb an
industrial development on this scale, the eye will be inexorably drawn
to nine, white, steel, three hundred and thirty five foot, rotating windmills,
set 1500 foot above sea level, as there are no competing elements to lessen
their impact.
- Because the turbines would look down into the national park, the Eden
Valley and North Pennines area of outstanding beauty, the visual impact
will be more intrusive because the huge structures will be silhouetted
against the horizon.
- The Northern Fells are recognised as a landscape of International, National
and Local significance, characterised by their quiet, unspoilt beauty;
this unique selling point will be lost.
- The Landscape Visual Impact Assessment (LVIA) doesn't fully take into
account the value to the nation of the aesthetic, social, historical,
cultural, literary,archeological, ecological and spiritual quality of
this area of Lakeland.
- A LVIA has neither been carried out for Blencathra and Sharp Edge, nor
Mungrisdale and associated satellite settlements.
For more information and ways to object to the wind farm visit Berrier
Wind Farm Objection Group website